Hot Product

Product drawing»

Structural drawing»

You are here:  

Testing of Intrinsically safe barriers

2010-10-29

Test I.S. Barrier,How frequently should you test them?
What is the testing procedure for one?No special maintenance of intrinsically safe systems is required. Once a year the barriers should be checked to ensure that the connections are tight, the ground wiring has less then one ohm of resistance, and the barriers are free from moisture and dirt. Check the panel and conduits for separation and identification of the intrinsically safe wiring. Never test the barrier with an ohmmeter or other test instrument while it is connected in the circuit (see figure 11). This bypasses the barrier and could induce voltages into the intrinsically safe wiring.
No testing is needed.  Just installation check valves.  I once showed up to a sterilization plant to install new controls.  They had all the IS wiring sharing a raceway with 480Vac..


MORE NEWS

  • Installation of control valve
  • Capacitor size for actuating two latching solenoids
  • Contact corrosion stud-bolts/flanges
  • Three Mile Island - Stuck open PORV
  • Shanghai MeiYan Yi Pump & Valve Co., Ltd.
    MeiYan Yi solenoid valve Contact MeiYan Yi
    Shanghai Enine Pump & Valve Co., Ltd.
    Enine solenoid valve Contact Enine
    Shanghai Saitai Pump & Valve CO., Lid.
    Saitai solenoid valve Contact Saitai
    Shanghai Fengqi Industrial Development Co., Ltd.
    FengQi solenoid valve Contact FengQi