Hot Product

Product drawing»

Structural drawing»

You are here:  

Shut Down time Shut down Valve in hydrocarbon export line.

2010-11-11

Regarding time within which a shutdown valve of hydrocarbon export line should close.
The last time I checked, offshore regulations permitted up to 45 seconds to close a shutdown valve.  A throwdown number for valve closure is one second per inch body size.  Some valves over NPS 24 may require quick exhaust valves to meet beat the 45 second requirement.  My throwdown basis is spring-opposed ball valves.  The number is reasonable for butterfly valves although they should close more quickly.  If a faster closure is required you can work with the engineers to select larger actuators and tricked out pneumatic accessories.
Just check for hammer.  On fail close valve, I buy several different sinter bronze or aluminum vent filters.  Each one has its own Cv and find the one that works for the valve.


MORE NEWS

  • Servo controlled linear actuator for ATEX application
  • Series Mounted Valves, Cv
  • Determining Product Quality of Valve Manufacturers
  • Electronicly Controlled Drain Valve - MFG
  • Shanghai MeiYan Yi Pump & Valve Co., Ltd.
    MeiYan Yi solenoid valve Contact MeiYan Yi
    Shanghai Enine Pump & Valve Co., Ltd.
    Enine solenoid valve Contact Enine
    Shanghai Saitai Pump & Valve CO., Lid.
    Saitai solenoid valve Contact Saitai
    Shanghai Fengqi Industrial Development Co., Ltd.
    FengQi solenoid valve Contact FengQi